75/5

This weekend’s job,
Wiring,,,,
Every thing is new,looms ign switch etc etc.
I’d rather do it in one go ,undisturbed.
You need to get in the groove and concentrate.
Next week the bike will be up to the work workshop for commissioning,.
Did I mention that it’s for sale:D
 
All done,
 

Attachments

  • 0485950C-0C40-4C77-B070-075AF7636BE6.jpg
    0485950C-0C40-4C77-B070-075AF7636BE6.jpg
    260.5 KB · Views: 232
  • D04D23D7-2D57-4C87-9AB6-BCE1E6F7A9A1.jpg
    D04D23D7-2D57-4C87-9AB6-BCE1E6F7A9A1.jpg
    254.6 KB · Views: 233
  • EA749787-D072-40D4-B0E2-270F272C62FD.jpg
    EA749787-D072-40D4-B0E2-270F272C62FD.jpg
    257.3 KB · Views: 237
  • 9117924E-8BAE-4D5A-B159-95A9067902FC.jpg
    9117924E-8BAE-4D5A-B159-95A9067902FC.jpg
    251 KB · Views: 233


Back
Top Bottom